Contact Us

Saveto (10th of Ramadan)

Challenge

The operating room was located far from the weighbridge, making it difficult to establish a direct connection and ensure smooth operation.

Solution

We leveraged Zweigh’s advanced technology and connectivity features to seamlessly link the operating room with the weighbridge and trucks, ensuring efficient communication and uninterrupted workflow.

Contact us

Main contractor

Direct

Year

2025

Location

10th of Ramadan City, Egypt

Industry

Industrial and Manufacturing

Project Photos

From The Site

WhatsApp