Knauf

Challenge
They required a weighbridge installation at their Ain Sokhna plant that could meet the group’s stringent German engineering and quality standards. As a global manufacturer operating across 250+ facilities worldwide, Knauf’s procurement and technical teams held suppliers to a higher bar, demanding precision, compliance, and documentation that matched their internal benchmarks — leaving no room for shortcuts or substandard execution.
Solution
ZFA delivered a steel platform weighbridge that fully aligned with Knauf’s rigorous German standards, from materials and structural specifications to installation quality and calibration accuracy. Every stage of the project was executed with the precision and attention to detail that a global manufacturer of Knauf’s caliber demands, resulting in a fully compliant, high-performance weighbridge at their Ain Sokhna facility, ready to support the accurate measurement of raw gypsum and finished building material flows across the plant.
Main contractor
Direct
Year
2026
Location
Ain Al Sokhna, Egypt
Industry
Industrial and Manufacturing


