Saveto (10th of Ramadan)

Challenge
The operating room was located far from the weighbridge, making it difficult to establish a direct connection and ensure smooth operation.
Solution
We leveraged Zweigh’s advanced technology and connectivity features to seamlessly link the operating room with the weighbridge and trucks, ensuring efficient communication and uninterrupted workflow.
Main contractor
Direct
Year
2025
Location
10th of Ramadan City, Egypt
Industry
Industrial and Manufacturing
Project Photos




